Buildings Applications Register
Gold Coast Airport is committed to driving sustainable investment and regional development through well-managed infrastructure growth. All land use planning and building works at the airport fall under the Airports Act 1996 and the Airports (Building Control) Regulations 1996. Any building activity must be approved by the Airport Building Controller (ABC).
To guide stakeholders and investors, we’ve developed clear Development Guidelines aligned with the airport’s Master Plan, outlining application processes and planning objectives for future development.
ABC REF NO:
BAN-24-OOL-0068
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
BCS Airport Systems Pty Ltd
Description of Proposed Building Activity:
Baggage Handling System Upgrade
Location of the Building Activity at Gold Coast Airport:
Domestic Goods Room
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
09/12/2024
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
09/12/2024
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-24-OOL-0034
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
WHSmith Australia Pty Ltd
Description of Proposed Building Activity:
Fit out of new toys and confectionary store
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport- Airside Site 16
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
01/06/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
04/10/2024
ABC REF NO:
BAN-24-OOL-0063
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Ltd
Description of Proposed Building Activity:
GCA T2 - Virgin Airline Engineering Fitout
Location of the Building Activity at Gold Coast Airport:
Southern, airside end of Terminal 2
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
19/11/2024
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
19/11/2024
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-24-OOL-0062
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Dnata Catering
Description of Proposed Building Activity:
Dnata Catering – Replacement Freezer
Location of the Building Activity at Gold Coast Airport:
Dnata Catering and Retail, 39-43 Eastern Avenue Site 104, Coolangatta Airport (Bilinga) 4225
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
13/11/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-24-OOL-0055
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
GC Airport Car and Dog Wash
Description of Proposed Building Activity:
GC Car Wash – Install Shade Sail
Location of the Building Activity at Gold Coast Airport:
Front of Automatic Wash Airport Central
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
12/10/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-24-OOL-0051
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Airport Retail Enterprises Pty Ltd
Description of Proposed Building Activity:
Social Espresso – Installation Pergola
Location of the Building Activity at Gold Coast Airport:
Social Espresso External Area, Tenancy RT02
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
30/09/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-24-OOL-0045
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Bishopp Outdoor Advertising
Description of Proposed Building Activity:
Install 2 x LED Video Walls on back wall of reclaim 6 and 5 and 4 x Bag belt units on reclaim fingers (Reclaims 5/6)
Location of the Building Activity at Gold Coast Airport:
International Bag claim area
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
14/08/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
25/10/2024
ABC REF NO:
BAN-24-OOL-0033
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Steambrook Pty Ltd (Trading as Seed)
Description of Proposed Building Activity:
New retail fit out SEED
Location of the Building Activity at Gold Coast Airport:
Site 75 Domestic Terminal
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
20/06/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
01/10/2024
ABC REF NO:
BAN-24-OOL-0028 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
1 - BP AHU Upgrade, Stage 2. Replacement of 9 end of life AHU's with additional 2 units to independently serve APZ zones. Alterations and additional new internal duct work.
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport, Terminal 1, Terminal Dr. Airside, roof top plant decks inc. departure lounge.
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
06/06/2024
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
06/06/2024
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
17/07/2024
ABC REF NO:
BAN-24-OOL-0028 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
2 - BP - 100% Ductwork Design
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport, Terminal 1, Terminal Dr. Airside, roof top plant decks inc. departure lounge.
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
06/06/2024
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
06/06/2024
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
03/09/2024
ABC REF NO:
BAN-24-OOL-0028 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
3 - BP - 100% Plant Design
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport, Terminal 1, Terminal Dr. Airside, roof top plant decks inc. departure lounge.
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
06/06/2024
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
06/06/2024
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
13/11/2024
ABC REF NO:
BAN-24-OOL-0029
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Airport Retail Enterprises Pty Ltd
Description of Proposed Building Activity:
Install of prefabricated KOMBI COFFEE VAN
Location of the Building Activity at Gold Coast Airport:
Site 65 – Install Kombi Van
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
31/05/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
11/10/2024
ABC REF NO:
BAN-24-OOL-0018
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Upgrade of the existing carpark area to connect the Southern Cross Drive with the Southern Entry Road project.
Location of the Building Activity at Gold Coast Airport:
Southern Cross University Carparks (including Carpark F) - Connection Road between the Southern Cross Drive and the Southern Entry Road project
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
27/03/2024
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
27/03/2024
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
17/07/2024
ABC REF NO:
BAN-24-OOL-0016
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Terminal - Wollumbin Cafe Storeroom Level 2 (R16)
Location of the Building Activity at Gold Coast Airport:
International Terminal
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
13/03/2024
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
13/03/2024
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
31/05/2024
ABC REF NO:
BAN-24-OOL-0003
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Australian Federal Police
Description of Proposed Building Activity:
Office refurbishment Level 2 and minor works Level 1 Ivy Pearce Building
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport Precinct, 5 Arthur Butler Parade, Bilinga QLD 4225 Ivy Pearce Building
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
18/01/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/04/2024
ABC REF NO:
BAN-24-OOL-0001
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
WTH Pty Ltd
Description of Proposed Building Activity:
Building patio for Avis Budget wash extension to the wash bag end
Location of the Building Activity at Gold Coast Airport:
Avis Budget Gold Coast Airport wash, 6 Tom Norris Drive, Bilinga, QLD
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
08/01/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
28/08/2024
ABC REF NO:
BAN-23-OOL-0087
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Creative 9 Pty Ltd
Description of Proposed Building Activity:
Fitout of Kiosk Store Sunglass Hut
Location of the Building Activity at Gold Coast Airport:
Site 39 Domestic Terminal
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
25/01/2024
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/04/2024
ABC REF NO:
BAN-23-OOL-0082
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Airport Retail Enterprises Pty Ltd
Description of Proposed Building Activity:
Demolition of existing Coast Bar and BOH Kitchen. Fit out of new Beach Shack Bar and BOH Merlo Kitchen
Location of the Building Activity at Gold Coast Airport:
Terminal 1 - Fit Out Site 2
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
23/11/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
21/02/2024
ABC REF NO:
BAN-23-OOL-0075 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Novak Camozzi PLN Projects
Description of Proposed Building Activity:
1 - BP - Cladding replacement - Remove and replace the ISP (higher risk existing non-compliant cladding product)
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport Precinct, 5 Arthur Butler Parade, Bilinga QLD 4225 Ivy Pearce Building
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
16/11/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
08/03/2024
ABC REF NO:
BAN-23-OOL-0075 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Novak Camozzi PLN Projects
Description of Proposed Building Activity:
2 - BP - Fire Engineering Report
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport Precinct, 5 Arthur Butler Parade, Bilinga QLD 4225 Ivy Pearce Building
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
02/05/2024
ABC REF NO:
BAN-23-OOL-0072
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Existing building space to be converted into retail facility as shown on the endorsed documentation. Hip Pocket Tenancy
Location of the Building Activity at Gold Coast Airport:
1 Eastern Ave, Coolangatta. Building B. Airport precinct
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
07/11/2023
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
07/11/2023
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
11/01/2024
ABC REF NO:
BAN-23-OOL-0070
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Installation of new egress stairwell to Level 1 of the Dnata building
Location of the Building Activity at Gold Coast Airport:
Site 104 Dnatatbuilding
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
19/10/2023
If GCAPL is not the applicant, Date on which GCAPL received Application:
nan
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
19/10/2023
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
16/02/2024
ABC REF NO:
BAN-23-OOL-0069
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Minor civil, traffic signage and line marking. Areas 1,2,3,4
Location of the Building Activity at Gold Coast Airport:
Front of Terminal Ground Transport pickup and drop off areas
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
13/10/2023
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
13/10/2023
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
15/12/2023
ABC REF NO:
BAN-23-OOL-0068
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Open Projects Group Pty Ltd
Description of Proposed Building Activity:
Installation of new cool/freezer room and storage cage into HMS Host section of the main storage warehouse
Location of the Building Activity at Gold Coast Airport:
Terminal 2 storage warehouse
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
12/10/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
13/12/2023
ABC REF NO:
BAN-23-OOL-0067
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Dnata Catering Building Eastern Stairs
Location of the Building Activity at Gold Coast Airport:
Site 104 (Dnata Catering)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
18/10/2023
If GCAPL is not the applicant, Date on which GCAPL received Application:
nan
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
18/10/2023
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
08/02/2024
ABC REF NO:
BAN-23-OOL-0064
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
WTH Pty Ltd
Description of Proposed Building Activity:
Removal of Waste Oil tank 740L from the wash bay and replacing with new self bunded Oil tank 3000L
Location of the Building Activity at Gold Coast Airport:
Avis Budget Gold Coast Airport wash, 6 Tom Norris Drive, Bilinga, QLD
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
21/09/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
01/05/2024
ABC REF NO:
BAN-23-OOL-0062
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Remove and replace the existing culvert crossing structure with a new resilient paved structure.
Location of the Building Activity at Gold Coast Airport:
Airside northern culvert crossing of Coolangatta Creek
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
11/09/2023
If GCAPL is not the applicant, Date on which GCAPL received Application:
nan
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
11/09/2023
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
24/11/2023
ABC REF NO:
BAN-23-OOL-0061
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Lot 5 Access Road - Upgrade of the existing connecting road between the future carpark (lot 5) and the Southern Entry Road
Location of the Building Activity at Gold Coast Airport:
Southern Precinct - Lot 5 - Car Park
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
04/09/2023
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
04/09/2023
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
06/11/2023
ABC REF NO:
BAN-23-OOL-0060
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
WHSmith Australia Pty Ltd
Description of Proposed Building Activity:
Fitout of new retail and café tenancy WH Smith Book Cellar
Location of the Building Activity at Gold Coast Airport:
Terminal 1 - Site 13
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
31/08/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
06/06/2024
ABC REF NO:
BAN-23-OOL-0058
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Heinemann Australia Pty Ltd
Description of Proposed Building Activity:
Fit out of heinemann retail tenancy including flooring ceiling services and joinery
Location of the Building Activity at Gold Coast Airport:
Terminal 1 - Site 4
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
16/08/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
03/10/2023
ABC REF NO:
BAN-23-OOL-0054
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Open Projects Group Pty Ltd
Description of Proposed Building Activity:
Fit out of site 44
Location of the Building Activity at Gold Coast Airport:
Terminal 1 - Site 44
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
22/08/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/10/2023
ABC REF NO:
BAN-23-OOL-0053
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Open Projects Group Pty Ltd
Description of Proposed Building Activity:
Construction and installation of kiosk
Location of the Building Activity at Gold Coast Airport:
Terminal 1 - Site 58
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
16/08/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
18/09/2023
ABC REF NO:
BAN-23-OOL-0050
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
UG Manufacturing Pty Ltd
Description of Proposed Building Activity:
Refurbishment of existing retail tenancy (Boardriders)
Location of the Building Activity at Gold Coast Airport:
Terminal 1 - Tenancy 5
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
24/08/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
28/02/2024
ABC REF NO:
BAN-23-OOL-0048
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Airport Retail Enterprises Pty Ltd
Description of Proposed Building Activity:
Site demolition NRG & Sandbar fit out
Location of the Building Activity at Gold Coast Airport:
Terminal 1 - Site 52
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
25/07/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
19/10/2023
ABC REF NO:
BAN-23-OOL-0041 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 1 - WP - Carparks works
Location of the Building Activity at Gold Coast Airport:
Southern Precinct - Lot 5 - Car Park
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
22/06/2023
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
22/06/2023
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
15/12/2023
ABC REF NO:
BAN-23-OOL-0041 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage - 2 - BP - Covered Walkway
Location of the Building Activity at Gold Coast Airport:
Southern Precinct - Lot 5 - Car Park
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
31/05/2024
ABC REF NO:
BAN-23-OOL-0041 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage - 3 - WP - Additional Road Signage
Location of the Building Activity at Gold Coast Airport:
Southern Precinct - Lot 5 - Car Park
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
10/10/2024
ABC REF NO:
BAN-23-OOL-0040
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Open Projects Group Pty Ltd
Description of Proposed Building Activity:
Store fit out
Location of the Building Activity at Gold Coast Airport:
Terminal 1 - Hungry Jacks
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
21/06/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
23/10/2023
ABC REF NO:
BAN-23-OOL-0035
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
KillMill Pty Ltd
Description of Proposed Building Activity:
Installation of 2 EV chargers
Location of the Building Activity at Gold Coast Airport:
471 Tom Norris Drive Bilinga, Wash Bay Facility
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
31/05/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Retracted
Date on which the ABC made its determination / Date on which application withdrawn:
Retracted
ABC REF NO:
BAN-23-OOL-0033
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Airport Retail Enterprises Pty Ltd
Description of Proposed Building Activity:
Demolition of Coast Café and Fit out of Merlo Coffee
Location of the Building Activity at Gold Coast Airport:
Terminal 1 Tenancy 2
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
29/05/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
06/09/2023
ABC REF NO:
BAN-23-OOL-0027
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
ENV Remediation Pty Ltd
Description of Proposed Building Activity:
Demolition of abandoned underground storage tank
Location of the Building Activity at Gold Coast Airport:
Avis/Budget Site 412
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
02/06/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
06/12/2023
ABC REF NO:
BAN-23-OOL-0026
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Crosier Scott & Associates
Description of Proposed Building Activity:
New retail pharmacy fit out
Location of the Building Activity at Gold Coast Airport:
Terminal 1 - Site 6
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
27/04/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
04/08/2023
ABC REF NO:
BAN-23-OOL-0025
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Existing Terminal Retail Operational Optimisation
Location of the Building Activity at Gold Coast Airport:
Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
21/04/2023
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
21/04/2023
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
14/07/2023
ABC REF NO:
BAN-23-OOL-0022
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Open Projects Group Pty Ltd
Description of Proposed Building Activity:
Tenancy 10 in domestic terminal at Gold Coast Airport - Bistrot, Fresh, Asia Street Food and tenancy back of house
Location of the Building Activity at Gold Coast Airport:
Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
13/04/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/06/2023
ABC REF NO:
BAN-23-OOL-0020
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Airport Retail Enterprises Pty Ltd
Description of Proposed Building Activity:
Fit out of new café
Location of the Building Activity at Gold Coast Airport:
Terminal 1 Site RT02 STE Arrivals
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
29/03/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
19/10/2023
ABC REF NO:
BAN-23-OOL-0006 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Airport Retail Enterprises Pty Ltd
Description of Proposed Building Activity:
Site 8 - Fit out new Paradox Coffee and Bar 1 - BP - Demolition works and hoarding installation
Location of the Building Activity at Gold Coast Airport:
Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
25/01/2023
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
27/03/2023
ABC REF NO:
BAN-23-OOL-0006 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Airport Retail Enterprises Pty Ltd
Description of Proposed Building Activity:
2 - BP - Tenancy fitout
Location of the Building Activity at Gold Coast Airport:
Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
nan
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
05/04/2023
ABC REF NO:
BAN-22-OOL-0009
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Bishopp Outdoor Advertising
Description of Proposed Building Activity:
Installation of LED screens and signage at GCAL terminal
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport Main Terminal Domestic Bagclaim, Domestic Arrivals Corridor Above exit doors next to Car Hire Desks
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
17/05/2022
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/06/2022
ABC REF NO:
BAN-22-OOL-0012 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Heinemann Australia Pty Ltd
Description of Proposed Building Activity:
1 - Building Permit
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport Southern Terminal Expansion (PLIFT)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
28/03/2022
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
28/03/2022
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
26/06/2022
ABC REF NO:
BAN-22-OOL-0012 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Heinemann Australia Pty Ltd
Description of Proposed Building Activity:
BP - Chanel & JB Hi-Fi
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport Southern Terminal Expansion (PLIFT)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
28/03/2022
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
28/03/2022
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
17/10/2022
ABC REF NO:
BAN-22-OOL-0012
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Heinemann Australia Pty Ltd
Description of Proposed Building Activity:
4 - Shopfront Shutter Upgrade
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport Southern Terminal Expansion (PLIFT)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
28/03/2022
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
28/03/2022
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
24/02/2023
ABC REF NO:
BAN-22-OOL-0023
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
GC Airport Car & Dog Wash
Description of Proposed Building Activity:
Stage 1 -BP- Alterations and Additions to an Existing Car Wash Facility
Location of the Building Activity at Gold Coast Airport:
GC Airport Car & Dog Wash Airport Central
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
08/06/2022
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
16/08/2022
ABC REF NO:
BAN-22-OOL-0049 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
Update of Fire Engineering Report (FER) for the existing Terminal Building Stage 1 - BP - Fire Engineering Approval
Location of the Building Activity at Gold Coast Airport:
Terminal Building 1 (Site 221) Terminal Drive Bilinga
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
03/12/2022
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
03/12/2022
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
06/12/2022
ABC REF NO:
BAN-22-OOL-0049 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
Stage 2 - BP - Amended Fire Engineering Report Approval
Location of the Building Activity at Gold Coast Airport:
Terminal Building 1 (Site 221) Terminal Drive Bilinga
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
14/04/2023
ABC REF NO:
BAN-22-OOL-0086
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Site 3A WHSmith fitout
Description of Proposed Building Activity:
Fitout of new retail tenancy
Location of the Building Activity at Gold Coast Airport:
Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
16/12/2022
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
20/02/2023
ABC REF NO:
BAN-21-OOL-0031 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 1 - Works Permit Civil Works - Gold Coast Highway Southern Entry
Location of the Building Activity at Gold Coast Airport:
Southern Entry to the GCA precinct from the Gold Coast Highway
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
01/10/2021
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
01/10/2021
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
12/07/2023
ABC REF NO:
BAN-21-OOL-0031 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 4 - WP - Electrical DB amendments- Gold Coast Highway Southern Entry
Location of the Building Activity at Gold Coast Airport:
Southern Entry to the GCA precinct from the Gold Coast Highway
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
01/10/2021
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
01/10/2021
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
20/09/2024
ABC REF NO:
BAN-21-OOL-0012
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
WSP Australia Pty Ltd
Description of Proposed Building Activity:
Stage 1 -WP- Installation of 7x Ground Water Monitoring Wells
Location of the Building Activity at Gold Coast Airport:
Airside Apron - Adjacent to the hydrant line
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
23/04/2021
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/03/2023
ABC REF NO:
BAN-20-OOL-0019 -15/1809
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Sierra Fitness
Description of Proposed Building Activity:
Sierra Fitness fit-out
Location of the Building Activity at Gold Coast Airport:
Sierra Fitness Airport Central
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
25/03/2015
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
02/04/2015
ABC REF NO:
BAN-19-OOL-0066 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Advanced Commercial Project Pty Ltd
Description of Proposed Building Activity:
Stage 1 - BP - Internal/External Refurbishment work & Fuel Services Works (Zone 1 & 2)
Location of the Building Activity at Gold Coast Airport:
Freedom Fuel Airport Central
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
19/02/2020
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
15/06/2020
ABC REF NO:
BAN-19-OOL-0066 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Advanced Commercial Project Pty Ltd
Description of Proposed Building Activity:
Stage 3 - BP - Amendment to Stage 1 Approval
Location of the Building Activity at Gold Coast Airport:
Freedom Fuel Airport Central
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
19/02/2020
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
28/07/2020
ABC REF NO:
BAN-19-OOL-0066 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Advanced Commercial Project Pty Ltd
Description of Proposed Building Activity:
Stage 3 - BP - Amendment to Stage 1 Approval
Location of the Building Activity at Gold Coast Airport:
Freedom Fuel Airport Central
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
19/02/2020
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
31/07/2020
ABC REF NO:
BAN-19-OOL-0066 Stage 4
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Advanced Commercial Project Pty Ltd
Description of Proposed Building Activity:
Stage 4 - BP - Pylon Sign
Location of the Building Activity at Gold Coast Airport:
Freedom Fuel Airport Central
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
19/02/2020
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
16/10/2020
ABC REF NO:
BAN-19-OOL-0066 Stage 5
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Advanced Commercial Project Pty Ltd
Description of Proposed Building Activity:
Stage 5 -WP- Treatment System (Stage 3)
Location of the Building Activity at Gold Coast Airport:
Freedom Fuel Airport Central
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
19/02/2020
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
11/04/2022
ABC REF NO:
BAN-19-OOL-0038
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Chopperline
Description of Proposed Building Activity:
Chopperline extended hangar
Location of the Building Activity at Gold Coast Airport:
Hangar 51 Lores Bonney Ct
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
29/08/2012
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
31/01/2013
ABC REF NO:
BAN-19-OOL-0037
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Eye Corp Australia Pty Ltd
Description of Proposed Building Activity:
Maintenance works 6 external large format advertising signs
Location of the Building Activity at Gold Coast Airport:
Eastern Ave and Terminal Dr
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
17/09/2012
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
20/11/2012
ABC REF NO:
BAN-19-OOL-0008 -11/6690 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
BP Australia Pty Ltd
Description of Proposed Building Activity:
BP JUHI Fuel Depo (Calex) Stage 1
Location of the Building Activity at Gold Coast Airport:
Site 143 Tower Road
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
09/08/2011
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
11/08/2011
ABC REF NO:
BAN-19-OOL-0008 -11/6690 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
BP Australia Pty Ltd
Description of Proposed Building Activity:
Stage 2
Location of the Building Activity at Gold Coast Airport:
Site 143 Tower Road
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
09/08/2011
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-19-OOL-0008 -11/6690 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
BP Australia Pty Ltd
Description of Proposed Building Activity:
Stage 3
Location of the Building Activity at Gold Coast Airport:
Site 143 Tower Road
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
09/08/2011
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-19-OOL-0003
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Southern Cross University
Description of Proposed Building Activity:
Stage 1 - BA - SCU Building B artwork light up and sporting area
Location of the Building Activity at Gold Coast Airport:
SCU Building B
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
22/01/2019
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
30/07/2019
ABC REF NO:
BAN-18-OOL-0076 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
Stage 1 - BA - Changes to walkway shade structure
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Between bus bay and Terminal 2
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
17/12/2018
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
17/12/2018
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
12/03/2019
ABC REF NO:
BAN-18-OOL-0076 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
Stage 2 - Amended BA for changes to walkway shade structure
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Between bus bay and Terminal 2
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
17/12/2018
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
17/12/2018
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
10/09/2019
ABC REF NO:
BAN-18-OOL-0076 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
Stage 4 - BP - Awning canopy to Terminal 2
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Between bus bay and Terminal 2
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
17/12/2018
If GCAPL is not the applicant, Date on which GCAPL received Application:
NA/a
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
17/12/2018
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
24/02/2020
ABC REF NO:
BAN-18-OOL-0048 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 1 -WP - Early Works Submission
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
5/02/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 1- BP - Early Works Submission
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
5/02/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 2 -WP- Temporary Hardstand & Dewatering Bund Amendment
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
04/03/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 4
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 4 -WP- Amendment to Dewatering Bund
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
15/03/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 5
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 5 -WP- Amendment to Bulk Earth Works Design Levels
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
18/04/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 6
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 1 -BP- Early Works Submission
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
03/06/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 7
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 3 -BP- Structure to Level 1
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
10/06/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 8
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 8 -BP- Crane Foundations
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
11/06/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 9
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 9 -BP- Structure Level 1 to 7
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
18/07/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 10
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 6 -BP- Bathroom Pods
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
29/08/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 11
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 12 -BP- Basement Services
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
01/10/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 12
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 14 -WP- High Voltage Services
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
06/11/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 13
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 13 -BP- Facade Approval
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
06/11/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 14
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 11 -BP- Architectural & Services
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
16/12/2019
ABC REF NO:
BAN-18-OOL-0048 Stage 15
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 16 -BP- Architectural & Services Level 7
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
10/03/2020
ABC REF NO:
BAN-18-OOL-0048 Stage 16
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 18 -WP- Stage 7 Driveway Crossovers
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
08/05/2020
ABC REF NO:
BAN-18-OOL-0048 Stage 17
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 19 -BP- Pool Structure
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
02/06/2020
ABC REF NO:
BAN-18-OOL-0048 Stage 18
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 20 -BP- External Works
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
24/07/2020
ABC REF NO:
BAN-18-OOL-0048 Stage 19
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Stage 23 -WP- Landscaping
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
05/08/2020
ABC REF NO:
BAN-18-OOL-0048 Stage 20
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast International Airport Hotel Pty Ltd
Description of Proposed Building Activity:
Fire system design testing and commissioning
Location of the Building Activity at Gold Coast Airport:
Terminal Drive Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
06/09/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-18-OOL-0046
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Snore Australia Pty Ltd
Description of Proposed Building Activity:
Stage 1 - All building works excluding special fire services
Location of the Building Activity at Gold Coast Airport:
Tenancies B3, B5 & B7 Airport Central
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
01/09/2011
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
03/11/2011
ABC REF NO:
BAN-18-OOL-0043 11/8536
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Air Gold Coast
Description of Proposed Building Activity:
Stage 1 - Alter and extend existing hangar and offices and associated civil works
Location of the Building Activity at Gold Coast Airport:
34 Eastern Ave
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
24/10/2011
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-18-OOL-0017 17/2016
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Bureau of Meteorology
Description of Proposed Building Activity:
Install meteorological equipment
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
nan
If GCAPL is not the applicant, Date on which GCAPL received Application:
16/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
nan
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
TBC
Date on which the ABC made its determination / Date on which application withdrawn:
TBC
ABC REF NO:
BAN-18-OOL-0016 17/1385
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
NewsLink Pty Ltd
Description of Proposed Building Activity:
Refit of gold coast store
Location of the Building Activity at Gold Coast Airport:
Tenancy 1 Terminal 1 Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
19/05/2017
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
17/07/2017
ABC REF NO:
BAN-18-OOL-0012 16/7006 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
16/7006 Installation for electrical/communications services and associated infrastructure for ILS glide path and localiser site
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
13/07/2018
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
13/07/2018
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
11/10/2018
ABC REF NO:
BAN-18-OOL-0012 16/7006 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
16/7006 Vegetation management 300 strip clearing
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
13/07/2018
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
13/07/2018
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/01/2019
ABC REF NO:
BAN-18-OOL-0012 16/7006 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
16/7006 Fence/gate and road realignment/modifications to accommodate ARFF Rosenbauer 'Panther' vehicle at localiser site
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
13/07/2018
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
13/07/2018
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/01/2019
ABC REF NO:
BAN-18-OOL-0012 16/7006 Stage 4
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
stage 4 - WP - Asbestos stock pile amendment
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
13/07/2018
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
13/07/2018
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
11/10/2018
ABC REF NO:
BAN-18-OOL-0012 16/7006 Stage 5
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
stage 5 - WP - ILS power supply Trenching
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
13/07/2018
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
13/07/2018
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
17/10/2018
ABC REF NO:
BAN-18-OOL-0012 16/7006 Stage 6
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
N/A
Description of Proposed Building Activity:
stage 6 - WP - Amendment for localiser fence realignment
Location of the Building Activity at Gold Coast Airport:
N/A
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/01/2019
ABC REF NO:
BAN-18-OOL-0012 16/7006 Stage 7
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Gold Coast Airport Pty Ltd
Description of Proposed Building Activity:
stage 7 - WP - Amendment for additional 300m clearing
Location of the Building Activity at Gold Coast Airport:
Gold Coast Airport
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
13/07/2018
If GCAPL is not the applicant, Date on which GCAPL received Application:
N/A
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
13/07/2018
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/01/2019
ABC REF NO:
BAN-18-OOL-0010
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Hertz Australia Pty Ltd
Description of Proposed Building Activity:
Hertz demountable building 15/6759
Location of the Building Activity at Gold Coast Airport:
402 Tom Norris Drive
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
21/09/2015
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
13/01/2016
ABC REF NO:
BAN-18-OOL-0005 -16/2872 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
16/2872 Stage 1 - Project Life Ground Transport Infrastructure
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
08/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
02/06/2016
ABC REF NO:
BAN-18-OOL-0005 -16/2872 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 2 - GTI Main Works - Road Construction
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
08/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
29/07/2018
ABC REF NO:
BAN-18-OOL-0005 -16/2872 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 3 - WP - Water Main
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
08/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
10/01/2019
ABC REF NO:
BAN-18-OOL-0005 -16/2872 Stage 4
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 4 - WP - Culvert relocation/conduits for communications and electrical/stormwater pits and pipes
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
08/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
11/03/2019
ABC REF NO:
BAN-18-OOL-0005 -16/2872 Stage 5
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 5 - WP - Car Parking, Landscaping, Services, Civil Stormwater
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
08/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
21/05/2019
ABC REF NO:
BAN-18-OOL-0005 -16/2872 Stage 6
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 6 - WP - Light Pole Relocation
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
08/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
03/03/2020
ABC REF NO:
BAN-18-OOL-0004 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 1 - Lift Building (STE) extension to southern end of exist terminal Enabling and early works
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
09/10/2018
ABC REF NO:
BAN-18-OOL-0004 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 3 -WP- RPT Apron Upgrade Stage 1 & Stage 2B
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
10/02/2020
ABC REF NO:
BAN-18-OOL-0004 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 3 -WP- RPT Apron Upgrade Stage 1 & Stage 2B
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/09/2021
ABC REF NO:
BAN-18-OOL-0004 Stage 4
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Stage 10 -WP- Detention basin decommissioning
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
23/11/2021
ABC REF NO:
BAN-18-OOL-0004 Stage 5
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Approval 11 - BP - Fauna Fence
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
11/05/2022
ABC REF NO:
BAN-18-OOL-0004 Stage 6
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Queensland Airports Limited
Description of Proposed Building Activity:
Approval 12 - WP - Sludge Handling Area Hardstand
Location of the Building Activity at Gold Coast Airport:
Southern end of Terminal 1
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
20/12/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 1
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 1 -WP- Approval 1 - Enabling and Early Works
Location of the Building Activity at Gold Coast Airport:
Lift Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
09/10/2018
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 2
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 1 -BP- Approval 1 - Enabling and Early Works
Location of the Building Activity at Gold Coast Airport:
Lift Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
09/10/2018
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 3
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 5 -BP- Approval 5 - Gate 1 & 2
Location of the Building Activity at Gold Coast Airport:
Lift Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
17/04/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 4
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 6 -BP- Approval 6 - Baggage Hall Modifications
Location of the Building Activity at Gold Coast Airport:
Lift Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
30/04/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 5
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 7 -BP- Approval 7 - Temp. Site Accommodation (Phase 2)
Location of the Building Activity at Gold Coast Airport:
Lift Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
23/05/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 6
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 13 -WP- Approval 13- Stockpile of Excavated Material
Location of the Building Activity at Gold Coast Airport:
Lift Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
13/06/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 7
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 2 -WP- Approval 2 - Civil, Piling, Substructure & Inground Services
Location of the Building Activity at Gold Coast Airport:
Lift Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
2018-07-03
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
05/07/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 8
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 2 -BP- Approval 2 - Civil, Piling, Substructure & Inground Services
Location of the Building Activity at Gold Coast Airport:
Lift Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
05/07/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 9
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 8 -BP- Approval 8 - Temp. Ramp Offices
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
09/07/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 10
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 2 -BP- Approval 2 - Civil, Piling, Substructure & Inground Services
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
03/09/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 11
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 7 -BP- Approval 7 - Temp. Site Accommodation (Phase 2)
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
10/09/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 12
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 10 -BP- Approval 10 - Temp. Tug Tunnel
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
23/09/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 13
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 10 -BP- Approval 10 - Temp. Tug Tunnel
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
26/09/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 14
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 3 -BP- Approval 3A - Building Superstructure, Level 1 concrete Slab, All Concrete Verticals, Water Proofing, Loadbearing Block Work
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
26/09/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 15
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 2 -BP- Approval 2 - Civil, Piling, Substructure & Inground Services
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
18/10/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 16
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 2 -WP- Approval 2 - Civil, Piling, Substructure & Inground Services
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
06/11/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 17
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 11 -BP- Approval 11 - Southern APZ
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
31/10/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 18
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 16 -BP- Approval 3B - Building Superstructure, Level 2 Concrete Slab, Loadbearing Blockwork to Level 01, Structural Steel
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
24/11/2019
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 19
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 16 -BP- Approval 3B - Building Superstructure, Level 2 Concrete Slab, Loadbearing Blockwork to Level 01, Structural Steel
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
30/09/2020
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 20
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 13 -WP- Approval 13 - Stockpile of Excavated Material
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
05/03/2020
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 21
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 21 -BP- Approval 4A - Building Services
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
02/04/2020
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 22
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 19 -BP- Approval 14 - Baggage Handling System
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
18/05/2020
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 23
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 29 -BP- Approval 3B - Fix Links for Gate's 8 & 9
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
01/06/2020
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 24
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 25 -BP- Approval 17 - High Voltage Genset Enclosure
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
04/08/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 25
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 33 -BP- Approval 21 - Temp Tug Route
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
20/08/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 26
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 37 -BP- Approval 18 - Tug Charging Shelter
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
10/11/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 27
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 39 -BP- Fire Pump Room and Fire Tanks
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
12/11/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 28
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 22 -BP- Approval 4B - Facade and Roof
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
23/11/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 29
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 23 -BP- Approval 4C - Building fit-out and Finishes
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
26/11/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 30
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 40 -BP- Approval 23 - Main Terminal FIP Replacement
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
30/11/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 31
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 28 -BP- Approval 4E - Vertical Transportation
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
09/12/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 32
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 24 -BP- Approval 16 - Passenger boarding bridges
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
09/12/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 33
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 42 -BP- Approval 20 - Amended Mechanical Submission
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
15/12/2021
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 34
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 17 -WP- Approval 12 - Landscaping and external landside works
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
13/04/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 35
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 38 -BP- Approval 4F - Internal Aligning's
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
02/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 36
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 25 -BP- Approval 17 - High Voltage Genset Enclosure
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
02/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 37
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 25 -WP- Approval 17 - High Voltage Genset Enclosure
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
05/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 38
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 48 -BP- Various BCA Performance Solutions
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
13/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 39
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 48 -BP- Various BCA Performance Solutions
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
13/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 40
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 45 -BP- Performance Solutions - Access
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
13/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 41
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 45 -BP- Performance Solutions - Access
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
15/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 42
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 9 -BP- Approval 9 - Fire Engineering Report
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 43
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 47 -BP- Mechanical Ventilation to RT13 & RT16
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
22/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 44
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 39 -BP- Fire Pump Room and Fire Tanks
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
29/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 45
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 27 -BP- Approval 4D - Building Fire Services
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
29/07/2022
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 46
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 56 - WP - Stage 13 amended permit
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
12/07/2023
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 47
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 57 - WP - Rectification works to pedestrian crossing
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Revoked
Date on which the ABC made its determination / Date on which application withdrawn:
09/10/2023
ABC REF NO:
BAN-18-OOL-0003 16/4717 Stage 48
INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (REGULATION 2.04A)
Name of Applicant:
Lendlease Building Pty Ltd
Description of Proposed Building Activity:
Stage 57 - WP - Rectification works to pedestrian crossing
Location of the Building Activity at Gold Coast Airport:
Southern Terminal Expansion (STE)
If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:
N/A
If GCAPL is not the applicant, Date on which GCAPL received Application:
03/07/2018
INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (REGULATION 2.04B)
Date on which GCAPL made its determination:
N/A
How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):
Approval
Date on which the ABC made its determination / Date on which application withdrawn:
09/10/2023